Vidéos
4.8 tonnes are hanging and swaying 35 meters above the ground!🏗️
Our team, with the support of our trusted partners, carried out a high-precision operation for our client located in the “Le Dôme” building in Luxembourg.
The objective: to remove a generator set and an entire technical installation weighing 4.8 tonnes, located beneath the roof at a height of 35 meters.
To achieve this, meticulous planning and logistics were required:
- Partial dismantling and reassembly of the roof
- Lifting and removal using a crane
A complex mission that perfectly illustrates EGB’s expertise and versatility in technical building management.
